For rail operators and transit authorities

Built is not the same as running

A new line is only as good as the people who run it and the condition it is kept in. We help rail operators, transit authorities and the ministries that fund them keep assets safe and in service, and build the teams to run them.

Elevated metro train on a viaduct above city roads at sunset
800+
Rail and public-sector staff trained in Abuja
1997
Asset-integrity work since
3–4 wks
Health Check per line section
6–18 mo
Typical O&M programme

What we hear

  • “The line is built, but we don't have the people to run and maintain it.”
  • “The contractor built it, but they don't operate it, and maintenance is slipping.”
  • “After a shutdown or vandalism, we need to know what condition the assets are really in.”

How we help

Two ways to start

Rail Asset Integrity Health Check

An independent read on the real condition of a line, section by section, so maintenance money goes where the risk is.

What we look at

  • Track and track bed
  • Viaducts, bridges, stations and other structures
  • Drainage, groundwater and water ingress in tunnels
  • Corrosion of steel, reinforcement and fixings
  • Fire, life-safety and other safety-critical systems

What you get

  • A condition picture for each line section
  • Defects ranked by safety and service risk
  • A prioritised maintenance plan you can budget against

Three to four weeks per line section

O&M Capability & Capacity Building

The people side: building an in-house team that can run and maintain the line, rather than relying on the contractor that built it.

What we do

  • Training-needs analysis against the line's systems and roles
  • Curriculum design for operations and maintenance staff
  • Delivery with an experienced rail operating partner
  • Feedback from early cohorts in live operation to sharpen the programme

What you get

  • Trained operations and maintenance staff
  • A curriculum your organisation keeps and reuses
  • Less dependence on outside contractors over time

Typically six to eighteen months

The process

How a Health Check runs

  1. ScopeWe agree the line sections, the assets that matter most and what you already know about them.
  2. Desk reviewWe go through drawings, maintenance records, inspection reports and incident logs before anyone goes on site.
  3. Site inspectionOur engineers inspect each line section, including tunnels and structures, within your possession windows.
  4. Findings and planWe walk your team through the findings and hand over the prioritised maintenance plan. Where the gaps are about people rather than assets, we show how a capability programme would close them.

Track record

Work we have done

Nigerian programme participants with the Ezra & Macquarie team

Abuja light rail, Nigeria

800+ trained to run what was built

Abuja's light-rail line was built and financed, but the people to operate it were not yet in place. With Multimedia Training Institute, and Prasarana Malaysia as rail-training partner, we ran the training-needs analysis, built the curriculum and delivered training across rail operations, signalling, fare systems, rolling-stock and track maintenance. More than 800 personnel were trained across the wider programme.

  • Rail tunnels, SingaporeGroundwater leakage and infiltration control in rail tunnels for a major Singapore rail operator.
  • Corrosion and asset integrityCorrosion, asset-integrity and industrial-safety work for ports, government agencies and industrial operators through Envirotec Controls since 1997.
  • Corrosion trainingCorrosion and coatings training for a major international naval force, delivered with NACE (now AMPP).

Who leads the work

Your technical lead

Dr Ricky Gouthaman Jayaram

Dr Ricky Gouthaman Jayaram

Group Managing Director and technical lead

Ricky has run Envirotec Controls, the group's technical arm, since 1997, with nearly three decades of corrosion, asset-integrity and industrial-safety work across Singapore, Malaysia and Indonesia. He led the Abuja light-rail training programme and holds a doctorate in business administration (risk and safety management).

Meet the team →

Questions

Common questions

Can you inspect without disrupting service?

Yes. Site work is planned around your engineering hours and possession windows, and most of the desk review happens before we arrive.

We have just come out of a shutdown or vandalism. Where should we start?

With the Health Check on the affected line sections. It tells you what condition the assets are in now and what to fix first, before you commit to a full maintenance programme.

Do you replace our maintenance contractor?

No. We give you an independent view of asset condition and help you build your own team. The plan we hand over can be delivered by your staff, your current contractor or a new one.

Can the two offers be combined?

Yes, and they often are. The Health Check shows where the assets stand; the capability programme makes sure your team can keep them there.

Ezra & Macquarie

Keep your line in service.

Tell us about your line, its condition and your team, and we'll come back to you within two business days.